Course outline

AI foundations for construction teams

Why some work uses more of your plan

What makes a task larger or smaller, how routines add up over a month, and how to keep an eye on your plan.

5 min read

Every Clevis plan includes a monthly amount of bot work, shown in Settings as the percent of the plan your workspace has used. Some requests use a sliver of it and others use noticeably more. Knowing why helps you plan the month, and helps you notice when a routine is costing more than it is worth.

Bigger work uses more

The amount a task uses follows the amount of work the bot does: how much it reads, how many steps it takes, and how much it writes. A quick question answered from one record is small. Reading a full specification book, comparing two drawing sets, or working through a long task in a browser is large.

Illustrative size of each task, compared with a quick question

  • Quick question about one RFI
  • Summarize this week's RFI log
  • Draft follow-ups for overdue submittals
  • Read a 40-page specification section
  • Compare two revisions of a drawing set
  • Multi-step task in a supplier portal
Illustrative only. The actual amount depends on the documents and the steps involved.

Reading is usually the largest part. A bot that reads a document once can answer many follow-up questions about it in the same chat, so it is often better to ask several questions in one conversation than to start over each time.

Work that runs on its own

Routines and project watch run without anyone asking. A morning summary on five active projects, every weekday, adds up across a month in a way a single question never does. That is usually worth it, since it is work nobody had to do by hand, but it is the first place to look if the plan runs short.

  • Keep routines focused: "what changed since yesterday" reads less than "summarize the whole project".
  • Pause routines on projects that are on hold or closing out.
  • Check Usage in Settings for how much went to scheduled work versus requests.

Watching the month

Workspace admins see the percent used, when the plan resets, and once there is enough history, whether the plan is likely to run out early at the current pace. The breakdown by type of work, person, and day shows where it went.

0%25%50%75%100%Day 1Day 10Day 20Day 30

31% used by day 12. On pace to stay within the plan this month.

Drag the pace to see when the plan would run out. Most months follow the steady line.

If the plan does run out, work already in progress finishes and new bot work pauses until the month resets. An admin can add credits, which are used only after the plan runs out, or move to a larger plan. The Plan usage and Credits help articles cover the details.

Check your understanding

Optional

1. Which of these is likely to use the most of your plan?

2. Your plan is running ahead of pace mid-month. Where should you look first?

3. What happens to a task that is running when the plan runs out?