Keep your crews installing.
The drawing changes. The delivery slips. Your bots keep the next crew visit ready.

Give the paperwork
a teammate.
Crews that show up ready.
Prepare the crew briefing with current drawings, access commitments, and material dates. Bring open questions back to the GC.
Explore botsCrew preparation
Foundry Works crew preparation
- Zone B accessConfirmed
The GC has confirmed the installation area for the next crew visit.
- Panel P3 deliveryDate needed
Get the supplier’s confirmed date before committing the panel installation crew.
- Riser routeClarify revision
Resolve the changed route against the latest drawings before installation.
- Checked the electrical drawings
- Checked the delivery log
- Checked the gc coordination minutes
- Prepared the pack for review
Extra work, fully supported.
Keep instructions, labour tickets, and materials together. Prepare extra-work packages with missing support called out.
Explore agent workToGeneral contractor
Please find the extra-work package for the revised riser route, with the written direction, material records, and labour tickets.
Riser_Change_Submission.docxCloseout without the paper chase.
Organize test records, track sign-offs, and bring the as-built information into the closeout package.
Explore projects- Indexed 24 new test sheets
- Matched them to installed circuits
- Listed the missing sign-offs
Every week, already prepared.
Briefings land before the crew arrives. The paperwork is caught up before the week ends.
Explore the workspaceMorgan
Instruction, materials, and tickets are together. Tuesday’s ticket needs the foreman’s hours before it goes to the GC.
Riser_Change_Package.xlsx- Crew briefing7:00 AM
- Riser route clarified9:00 AM
- Labour tickets matched11:00 AM
- Extra-work package8:00 AM
- Panel P3 delivery1:00 PM
- Test sheets indexed10:00 AM
Built for the people
who build.
Questions.
Can we keep each GC’s work separate?
Yes. Keep each job's documents and conversations in its own project, and give bots access only where they need it.
Can Clevis help with extra-work submissions?
Give a bot the direction, labour tickets, material records, and current drawings. It can organize a draft and flag missing support for your review.
Do we have to change the tools we use today?
No. Upload the files you need or connect tools like Google Drive, Microsoft 365, and Xero. Your team keeps working the way it does now.
Is our project data secure?
Clevis checks access at every step, encrypts connections and stored project data, and keeps a record of what happened. See Security for the details.
Can we try Clevis on one project first?
Yes. Start free, add one project, and give a bot something to work on. Add more when you are ready.

