Course outline

Running projects with Clevis

Routines and project watch

Set focused recurring work, review what your bot reports when a project changes, and keep automatic work useful throughout the month.

6 min read

Dana prepares the Westbrook coordination list every Monday. She also wants to know when a new response changes the ceiling question between meetings. A routine can prepare the recurring review, and a bot that is responsible for Westbrook watches the project for changes worth attention. Both need a clear purpose and a person who will review the result.

Schedule a defined piece of work

A routine repeats instructions on a schedule. Ask your bot to prepare the Westbrook open-item review on the day you need it, naming the project, the time, and your time zone. Describe the result: items affecting the next lookahead, what changed since the previous review, and decisions needed. Read the saved routine and its schedule before leaving it to run.

You can give a routine direct instructions or have it follow a saved skill. Dana uses the meeting preparation procedure from lesson 2.1 and asks for a Monday morning review. A separate Friday closeout review would need its own purpose; copying the Monday summary to every weekday would create repeated reading without necessarily improving the meeting.

Westbrook open-item review · Example schedule

Frequency

Monday: review scheduled

Example time: 8:00 a.m., in Dana's selected time zone. Read changes since the previous review, list upcoming constraints, and cite sources.

One review each week. Each review uses a share of the plan; the amount depends on the work.

Change the frequency and select a day. This illustration does not save a real routine.

Let your bot watch the project

When you give a bot responsibility for a project, it watches that project. Important changes, like a new drawing or spec revision, an addendum, or a file in the RFIs folder, wake the bot to look into them right away. Smaller changes wait for its next scheduled check-in, and routine edits are left alone. Open its report to see the records and what it actually concluded. A useful report explains the condition, its possible effect, and the question the project team needs to settle.

At Westbrook, a new ceiling response might resolve one question while leaving the support coordination open. Ask your bot to walk through its report and the cited response before preparing a follow-up. The report does not establish that the field team has accepted the detail, nor that an outside system has changed just because a working note was updated.

Your bot can only review information available to it. A phone conversation that has not been recorded, or an unavailable document in a connected system, remains a gap. When a report conflicts with what happened on site, supply the missing information and check which conclusions need to change.

Keep recurring work focused

  • Name a project and a period. "Changes since the last coordination review" is clearer than "review everything."
  • Define what deserves attention. Ask for unanswered items affecting the next lookahead and the evidence for each.
  • Read the first results. Remove repeated background and correct assumptions before the routine repeats.
  • Pause work that is no longer useful. A project on hold rarely needs the same review as an active ceiling installation.

Give repeated work an ending as well as a beginning. Once the ceiling question is resolved, update the routine so it no longer spends each review rebuilding that history. Keep the source links and decision in the same conversation, then focus the next review on the work still ahead.

Watch its share of the plan

Routines and project watch use a share of the plan, just as questions you ask directly do. The amount follows the work: reading large sets of documents and running often uses more than a focused review of changed items. Automatic work adds up across projects even when no one is actively chatting. Project watch is part of paid plans, and the routine edits your bot leaves alone use none of it.

Check Usage in Settings to see how much went to scheduled work and to changes your bots looked into. If the pace is higher than expected, look first for repeated full-project summaries, overlapping routines, or projects that no longer need frequent attention. Today automatic work shares the same plan as other bot work; there is no separate automatic-work allowance to reserve.

Workspace admins can review the monthly pace and decide whether to narrow the work, pause a routine, or add capacity. If they add credits, those appear as a dollar balance and are used after the included plan is used. The Plan usage article explains what happens when the plan runs out.

Check your understanding

Optional

1. What is the clearest routine instruction?

2. Her bot reports a possible effect on ceiling work. What should Dana check?

3. Where should an admin look if automatic work uses more of the plan than expected?