Course outline

Running projects with Clevis

Putting it together: a week on a project

Follow one project team from a Monday review to Friday closeout, using bots, rooms, routines, and approvals.

7 min read

It is Monday on our example project, Westbrook Medical. East corridor ceiling work is coming up, A-502 revision 3 has changed the support detail, and RFI 214 still has an open coordination question. Dana, the project engineer, needs a clear set of decisions for the meeting. Here is how a week of bot work can stay connected to those decisions.

Monday: start with the open work

Dana's private bot has instructions to put the next lookahead first, a meeting preparation skill, and access to the connected project records she can read. Its Monday routine prepares changes since the previous review. In her bot's Home, Dana names Westbrook and asks it to focus on the ceiling work and name the source behind every status.

The review links the official RFI in Autodesk Construction Cloud, identifies the ceiling package returned for revision, and names the lookahead it checked. A Clevis working note brings those findings together. Dana confirms the dates and asks which missing answers need a decision before the field team can proceed.

Westbrook, Monday to Friday

All records and events in this week are illustrative. Select a day to follow the work.

Tuesday: read the revised detail

Dana tags both revisions of A-502 and asks for a comparison of the east corridor support detail. The bot identifies the added brace and coordination note, then cites the relevant material in section 09 51 00. It keeps the visible drawing change separate from its possible effect on installation.

A small callout is hard to read on the scan. Dana opens the original and supplies a clearer view before accepting that part of the comparison. She uses a side chat to investigate the detail without losing the meeting thread, then brings back the finding: the support coordination still needs a designer response. The comparison has prepared the question; it has not resolved the design.

Wednesday: work across roles in a room

Dana brings the question to a Westbrook room with the superintendent, estimator, and their bots. Her bot summarizes the drawing and RFI. The superintendent's bot checks the available sequence, while the estimator's bot identifies what would be needed to review the subcontractor's proposal. Each contribution names its sources and gaps.

The bots keep their owners' access. If a pricing record is unavailable to one bot, it says so; joining the room does not open the estimator's private material. The people decide what information belongs in the shared discussion. They end with a designer clarification, a field coordination check, and a request for supporting quantities, each assigned to someone.

Thursday: review before anything goes out

A new response lands in the RFIs folder, and Dana's bot, which watches Westbrook, looks into it right away. It reads the response against the unanswered question. The response settles one part of the detail but does not confirm the subcontractor's revised package. The bot updates its Clevis working record and prepares a focused follow-up.

Dana reads the draft, checks the recipient and attachment revision, and changes a sentence that promised a start date the superintendent has not confirmed. She approves the edited message, then checks the completed send in history. Later, an order check reaches a supplier portal login. She takes browser control, signs in herself, and returns control for the reading to continue.

Friday: carry forward only what remains open

Dana asks for confirmed changes, unfinished actions, and decisions for next week. The bot checks official statuses in the connected system and separates them from its working notes. An approved but unsuccessful action would stay unfinished. A prepared draft would stay a draft. The team keeps the ceiling coordination item open until the required evidence is present.

She also reviews the routine. The broad revision comparison was useful once; next Monday's review can focus on new responses and remaining constraints. The workspace admin checks the share of the plan used by recurring work. As installation progresses, Dana adjusts the review instead of repeating a full reading of the same drawing history.

Check your understanding

Optional

1. What keeps the week's follow-up grounded?

2. The room identifies a possible sequence effect. Who confirms the response?

3. What should Dana do with next Monday's routine?