Every answer
has a story.
Clevis keeps your drawings, RFIs, submittals, schedule, and costs connected. Ask a question and see the records behind the answer.
Why did the roof framing change on S-401?
The owner approved a larger rooftop unit for RTU-2 on Oct 151. It adds about 1,900 lb, so the engineer called for steel dunnage at grid 42. Rev 3 of S-401 shows the new framing3.
Behind this answer
- Meeting notesOct 15Owner approves the larger RTU-2OAC_Minutes_Oct15.pdf
- RFI 067Oct 17Roof support for the revised unitAnswered by the structural engineer
- Submittal 23 74 13Oct 19Packaged rooftop unit, revision 2In review
- Drawing S-401Oct 21Roof framing plan, Rev 3Dunnage added at grid 4
Records that stay connected
An RFI links to the drawings, spec sections, and files it asks about. Clevis follows those links when it answers, so the related records come back with it.
Explore projects- Linked drawings
- S-401 Rev 3 · M-301
- Linked specifications
- 23 74 13 · 2.4
- Supporting files
- RFI_067_Response.pdf
The story behind the answer
Ask how a decision came about. The submittal, the RFI, the response, and the meeting come back in order, each with its source.
Explore the workspaceHow did we end up with dunnage on the roof?
- Sep 29PN
The unit in the submittal is heavier than the roof was designed for.
Submittal 23 74 13 - Oct 6PN
RFI 067 asks whether the framing at grid 4 can carry it.
RFI 067 - Oct 13TB
The structural engineer answers: add steel dunnage across two joists.
RFI_067_Response.pdf · p. 2 - Oct 15LH
The owner approves the larger unit at the OAC meeting.
OAC_Minutes_Oct15.pdf
See what a change touches
A larger rooftop unit can move a drawing, a crane date, and a budget line. Ask what a change would affect and review the records before making the call.
Explore project watchDecision
RFI 042- Status
- Pending architect review Approved · east offset revision
- Response owner
- Design team queue Sam Chen
Schedule
Activity A1210- Float
- 5 working days 2 working days · at risk
- Successor
- Controls rough-in open Blocked pending release
Cost
CE-027- Exposure
- $420K pending pricing $620K priced · ready for review
Procurement
Switchgear package- Release
- On track for Jul 24 Hold until routing approval
Ownership
Field handoff- Waiting on
- Install crew idle Sam Chen · release by Wednesday
Your sources stay the source
Records from Autodesk or SharePoint keep their original number and a link back. Check the original before your team acts on it.
Explore integrations- Source
- Autodesk Construction Cloud
- Source ID
- RFI #214
- Status in source
- Answered
Questions.
Where does Clevis get its answers?
From the records in your workspace: the files you upload and the tools you connect. Each answer shows the sources it used.
Which tools can we connect?
Google Drive, Microsoft 365 apps like SharePoint, OneDrive, and Outlook, Xero, and more. See Integrations for the full list.
Will Clevis change data in our other tools?
Changes and sends to connected tools follow your approval settings. Your team reviews the action before anything leaves Clevis.
Can bots see projects they are not part of?
No. A bot only works with the projects and records you give it access to.