AHU controls submittal 118 is still with the engineer. A response by Wednesday protects Level 4 installation.
The whole project. One operating surface.
Bring project records, project agents, controls, and daily decisions into one place that can understand the work and help move it forward.
One project. Every operating thread.
The project is not a collection of disconnected modules. Clevis keeps the records, responsibilities, changes, and decisions connected as the work moves.
01
Record
RFI 042 · Mechanical routing
Harbor Point · Level 04
Linked in project graph
Records stay connected
Drawings, documents, RFIs, submittals, schedule activity, cost, tasks, and decisions remain part of the same project context.
02
Downstream of Submittal 118
Handoffs stay visible
Clevis shows where work is waiting, who owns the next move, and which downstream activities depend on it.
03
Publish RFI 042 response
Needs reviewDraft uses drawings A-612 and M-204. Writing to the project register waits for sign-off.
Controls stay intact
Agents can investigate and prepare work while consequential project changes continue to wait for the right approval.
See the handoffs before they become delays.
The live project schedule keeps field activities, milestones, ownership, float, and agent attention in one timeline, with a focused Gantt view on mobile.
Phase 1 Baseline
Jul 11, 2026 – Aug 22, 2026
Phase 1 Baseline
Coordination timeline
A bounded time window that separates human judgment, agent monitoring, and shared execution.
Know where the project money is moving.
Read budget, commitment, cost-to-date, forecast, and open exposure together. Then ask the project Coordinator to explain the movement against the underlying records.
Revised budget
$43.68M
Forecast final
$44.13M
Open exposure
$1.42M
Where is project cost moving this month?
Forecast final cost is $44.13M, currently $450K over the revised budget. Most of the movement is in mechanical systems and curtain wall. Open exposure is $1.42M, with $620K still pending.
Every project record, with its context around it.
The document library is connected to the drawings, specifications, correspondence, decisions, and project activity that give each file meaning.
| Name | Folder | Indexed | Source | Updated | By | Size | |
|---|---|---|---|---|---|---|---|
| Drawings | Indexed | Upload | Jul 18 | Sam Chen | 24.8 MB | ||
| RFIs | Indexed | Generated | Jul 18 | Project Coordinator | 1.2 MB | ||
| Submittals | Indexed | Procore | Jul 17 | Maria Lopez | 8.4 MB | ||
| Meetings | Indexed | OneDrive | Jul 16 | Sam Chen | 640 KB | ||
| Cost reports | Indexed | SharePoint | Jul 18 | Alex Morgan | 2.8 MB |
What changed in the latest mechanical coordination set?
The July 18 set moves the Level 2 main duct 14 inches east to clear beam B-17. That change is connected to RFI 042, Submittal 23 05 93, and Drawing M-204. The RFI response is still awaiting approval.
Give the project a team of agents.
Ask for an investigation, report, follow-up, or controlled action. Agents read the real project records, show their tool work, and pause when human judgment is required.
The project keeps watch between questions.
Sentinel wakes for real project signals, investigates what changed, and keeps the full autonomous run visible: from the first event through tools, reasoning, action, and result.
Useful for the work today. Durable for the project tomorrow.
Clevis keeps project intelligence close to the operating surface without loosening the project boundary or losing the record of how work moved.
Project-scoped
People and agents operate inside the project records, permissions, tools, and responsibilities available to them.
Boundary
This project only
Agents share context
Coordinator, Sentinel, and specialized project agents work from the same connected operating picture.
Shared context
Harbor Point graph
History remains inspectable
Questions, sources, tool calls, decisions, and changes stay attached from the first signal through the final result.
Run trail
…