The whole project. One operating surface.

Bring project records, project agents, controls, and daily decisions into one place that can understand the work and help move it forward.

Workspace/Harbor Point/Home
Give me the morning brief. What changed, what is at risk, and what needs my decision?
Reviewed 26 updates across 8 project registers
Compared the live schedule with the six-week lookahead

Good morning. The project remains on plan, with three items worth your attention.

Mechanical rough-in has 3 days of float

AHU controls submittal 118 is still with the engineer. A response by Wednesday protects Level 4 installation.

Schedule
$620K of open cost exposure needs review

Two change events now have subcontractor pricing and are ready for the owner forecast.

Cost
RFI 042 is ready for your approval

The drafted response resolves the routing conflict using drawings A-612 and M-204.

Decision

I can publish the RFI response, assign the submittal follow-up, or open the affected schedule activities.

Ask about this project…
Clevis uses the records and permissions available in Harbor Point.

One project. Every operating thread.

The project is not a collection of disconnected modules. Clevis keeps the records, responsibilities, changes, and decisions connected as the work moves.

01

Record

RFI 042 · Mechanical routing

Harbor Point · Level 04

Linked in project graph

Records stay connected

Drawings, documents, RFIs, submittals, schedule activity, cost, tasks, and decisions remain part of the same project context.

02

Downstream of Submittal 118

Handoffs stay visible

Clevis shows where work is waiting, who owns the next move, and which downstream activities depend on it.

03

Publish RFI 042 response

Needs review

Draft uses drawings A-612 and M-204. Writing to the project register waits for sign-off.

RejectApprove

Controls stay intact

Agents can investigate and prepare work while consequential project changes continue to wait for the right approval.

See the handoffs before they become delays.

The live project schedule keeps field activities, milestones, ownership, float, and agent attention in one timeline, with a focused Gantt view on mobile.

Phase 1 Baseline

Jul 11, 2026 – Aug 22, 2026

6-week Gantt
Activity
Jul 11
Jul 18
Jul 25
Aug 1
Aug 8
Aug 15
Aug 22

Know where the project money is moving.

Read budget, commitment, cost-to-date, forecast, and open exposure together. Then ask the project Coordinator to explain the movement against the underlying records.

Revised budget

$43.68M

Forecast final

$44.13M

Open exposure

$1.42M

$450K over
$0M$10M$20M$30M$40M$50MAprMayJunJulAugSepOctJULY MOVEMENT+$2.84M committed$3.40M cost postedForecast moved +$290K
Revised budgetCommittedCost to dateForecast final
You

Where is project cost moving this month?

Project Coordinator

Forecast final cost is $44.13M, currently $450K over the revised budget. Most of the movement is in mechanical systems and curtain wall. Open exposure is $1.42M, with $620K still pending.

Every project record, with its context around it.

The document library is connected to the drawings, specifications, correspondence, decisions, and project activity that give each file meaning.

All sourcesAll types
Project filesDrawings148 documents
NameFolderIndexedSourceUpdatedBySize
DrawingsIndexedUploadJul 18Sam Chen24.8 MB
RFIsIndexedGeneratedJul 18Project Coordinator1.2 MB
SubmittalsIndexedProcoreJul 17Maria Lopez8.4 MB
MeetingsIndexedOneDriveJul 16Sam Chen640 KB
Cost reportsIndexedSharePointJul 18Alex Morgan2.8 MB
You

What changed in the latest mechanical coordination set?

Project Coordinator

The July 18 set moves the Level 2 main duct 14 inches east to clear beam B-17. That change is connected to RFI 042, Submittal 23 05 93, and Drawing M-204. The RFI response is still awaiting approval.

Give the project a team of agents.

Ask for an investigation, report, follow-up, or controlled action. Agents read the real project records, show their tool work, and pause when human judgment is required.

You

Review RFI 042 against the latest drawings and draft a response.

Project Coordinator
  • Read RFI 042 and its current routing.

The project keeps watch between questions.

Sentinel wakes for real project signals, investigates what changed, and keeps the full autonomous run visible: from the first event through tools, reasoning, action, and result.

Workspace/Harbor Point/Sentinel

Scheduled project review

Harbor Point · Jul 19, 9:42 AM

Running

A scheduled heartbeat found three new records inside tomorrow's release window.

Sentinel is working…

Useful for the work today. Durable for the project tomorrow.

Clevis keeps project intelligence close to the operating surface without loosening the project boundary or losing the record of how work moved.

Project-scoped

People and agents operate inside the project records, permissions, tools, and responsibilities available to them.

Boundary

This project only

ProjectHarbor Point
RecordsIn scope
ToolsProject agents
PortfolioNo access

Agents share context

Coordinator, Sentinel, and specialized project agents work from the same connected operating picture.

Shared context

Harbor Point graph

History remains inspectable

Questions, sources, tool calls, decisions, and changes stay attached from the first signal through the final result.

Run trail

…