How project watch decides when to wake
On most construction projects, a project engineer begins the day by catching up on what came in since the last review. The architect issued a bulletin, two submittals came back, someone updated the procurement log, and a new revision of the reflected ceiling plans landed in the drawings folder.
Clevis bots can take on part of that catching up. When you ask a bot to look after a project, such as procurement on Harbor Point, it watches that project for changes. We call this project watch. We designed the timing around the way project teams already work: a few changes need a look as they happen, while most are easier to judge together at a regular review.
Each change therefore goes one of three ways. An important change wakes the bot right away. A smaller change waits for the bot's next scheduled check-in. Routine noise is left alone. The aim is a bot that keeps up with the project without adding another stream of low-value notifications.
An important change wakes the responsible bot now. A smaller change waits for the bot's next scheduled check-in. Routine noise, like the bot's own edits, is left alone.
What wakes a bot right away
A new revision of a drawing or specification section can change work that is already being bought, fabricated, or installed. An addendum or a bulletin can do the same across several trades at once. These are the changes a bot looks at as soon as they arrive.
A file that lands in the project's submittals or RFIs folder also gets an immediate look, such as a submittal returned for revision or an answered RFI. So does a controlled document that someone removes from the project.
When it wakes, the bot reads the change and the related records it can access. A revised mechanical sheet is more useful to the team when it arrives with the submittals and procurement dates it touches, so the bot reports with those records linked in its conversation with you.
Today, project watch follows the files in your Clevis project. Changes that live only in other systems, like a status in Procore, come up when the bot checks those connections during its regular work. Either way, the findings should be read alongside their sources.
What waits for the next check-in
Most project updates can wait for a regular review. Meeting minutes are filed, a revised lookahead is uploaded, a daily report comes in. Reading several of these together can reveal a connection that would be hard to see one notification at a time.
Each bot responsibility has a check-in schedule, for example every weekday morning or every Friday before the coordination meeting. The check-in opens with the changes since the bot's last look, so a document that didn't warrant waking the bot is still read against the open RFI or upcoming activity it might affect.
What it leaves alone
Some files carry nothing to review: voice notes, audio, and the temporary and system files that sync tools leave behind. Files the bot made itself don't count either. These are dropped before they reach the bot, so they don't use any of your plan.
Project engineers already have email, calls, meetings, and updates from several systems competing for attention. A bot that leaves ordinary activity alone keeps its useful findings easy to spot when something does need follow-up.
One issue can generate plenty of updates
Consider a submittal for the curtain wall anchors. Within a few minutes, the supplier's revised package is filed, the architect's marked-up copy replaces it, and a corrected version follows.
If each of those started separate work, the bot would spend its time on versions of the same problem. Repeat changes to the same file close together count as one, and the bot reads the latest version before it reports.
The project team already maintains and interprets its submittal log. Watching it this way reduces the manual effort of keeping up with repeated updates and collecting the context for a follow-up.
Repeated changes to the same item within a few minutes count as one change. The bot keeps the latest information together instead of starting disconnected work.
From a change to useful follow-up
Suppose a mechanical equipment submittal comes back for revision shortly before its planned release for fabrication. The engineer handling the package can evaluate the technical comments, but first needs the returned submission, the procurement milestone, and any prior correspondence in one place.
The returned package lands in the submittals folder, and the bot responsible for procurement on that project wakes, gathers those records, and reports in its conversation with you. It can then draft a question to the supplier or organize the documents the team needs to decide how to proceed.
The bot's approval settings apply to that work. Preparing an internal summary is different from sending instructions to an outside party or changing a record in another system. The relevant person reviews consequential actions before they go out.
Work continues while one decision is pending
A project manager may need time to review a proposed supplier instruction, particularly if it could affect fabrication or delivery. During that time, new RFIs arrive, drawings are revised, and other coordination keeps moving.
The bot keeps watching while an approval is pending. The proposed action stays with the person responsible for it, and unrelated changes are still looked at and reported. Nobody has to restart the bot's responsibility each time a decision needs a person's attention.
The bot looks into a change and prepares the follow-up. An action needing approval waits for your decision. Meanwhile the bot keeps watching and looks into the next change.
Fitting into the project team's day
Waking on important changes, holding smaller ones for a check-in, and leaving noise alone all serve the same practical purpose: less routine checking to keep up with a changing project. The team can still open the source material, ask the bot what changed since Tuesday, and decide how to handle what comes back.
As the project develops, the bot keeps reading the changes and preparing context for the people managing the work. That leaves project engineers and managers more time for coordination, field questions, and decisions that depend on their experience.